Day 2 went rather smoothly. By midmorning they had filled in the holes with the drainage tile and the rocks.  They also had rerun the sump pump outside too.  I am not sure why but it stunk really bad while doing all this.

basementbasement

After their lunch break, they finished laying the concrete.  I have to admit that I am impressed with the work that was done.  It looks great and this should solve all of our water issues.

basementbasement