1 min read
My House – The Construction Site
Well, the dumpster got delivered this morning. Tomorrow, Bill and his brothers start demoing the room that is in the basment. They have tear the drywall down and tear the subfloor out. We are suppose to have excellent weather (high of 62). Once that is done, Bill starts on the electric down there. He has to rerun a bunch of stuff, use some splitters, and get rid of all the boxes (I think they are called electrical boxes but I am not sure). Once that gets done, the drainage tile gets put in in the beginning of May. Then we have the drywall and the bathroom that needs to get done.
Well, my plans are to take a picture after they get done tomorrow, so you can see the before and after. 🙂
![Reblog this post [with Zemanta]](http://img.zemanta.com/reblog_e.png?x-id=e39bf70c-9efd-41b2-bf98-217811ab0407)