Day 2 went rather smoothly. By midmorning they had filled in the holes with the drainage tile and the rocks. They also had rerun the sump pump outside too. I am not sure why but it stunk really bad while doing all this.
After their lunch break, they finished laying the concrete. I have to admit that I am impressed with the work that was done. It looks great and this should solve all of our water issues.
The work's really fast. I saw the pictures from day 1 and I can say the pace was fast. It's also done neatly.